FedRAMP Controls / SA

SA-15(3) Criticality Analysis

Family SA
Baselines moderate
Mapped KSIs 1

Control statement

Require the developer of the system, system component, or system service to perform a criticality analysis:
    (a) At the following decision points in the system development life cycle: {{ insert: param, sa-15.03_odp.01 }} ; and
    (b) At the following level of rigor: {{ insert: param, sa-15.3_prm_2 }}.

Parameter placeholders {{ insert: param, … }} reference FedRAMP-set values in the resolved profile. Full parameter map is preserved in the catalog database.

Covered by these Key Security Indicators

KSITitleCategory
KSI-TPR-03Supply Chain Risk Management
_Persistently_ identify, review, and mitigate potential supply chain risks.
Third-Party Information Resources